In September, I attended the inaugural Launching AI-Native ARTs class at the SAFe Summit, taught by Rebecca Davis, Luke Hohmann and Tessa Powell. As the class moved through the four shifts and twelve success factors of an AI-Native ART, one question kept circling in my mind: what does "good enough to launch" look like?
We know from Core SAFe that "perfect" is neither necessary nor achievable. We've spent 15 years setting a date, training everybody and launching trains. If you've ever heard me talk about the ART Quickstart, you know I think it is a highly effective approach to creating a step change for an organisation. I'm not sure the same approach applies to launching an AI-Native ART. As with many things, I have concluded that there isn't a black-and-white answer to the question, so here are my musings on the shades of grey.
What the Class Gives You
Cheryl Crupi, the author of the course, describes it as a "learning shop": her term for a class and workshop rolled into one. I tend to agree. Over two days, you build a self-assessment, discuss it, and turn it into a plan to launch an AI-Native ART.
The class assumes you already have Core SAFe ARTs and that the organisation has identified the ART(s) it wants to relaunch with AI-Native SAFe, either as they are or after refactoring. Many ARTs aren't product-aligned today, so I expect a lot of organisations will need to refactor their ART(s) first. The AI-Native SAFe Implementation Roadmap recommends the first AI-Native ART sits at the intersection of four factors: AI-engaged leaders, teams already embracing AI, clear products and outcomes, and a significant AI opportunity. The roadmap also puts AI-Native SAFe Fundamentals ahead of the class, which seems like a natural way to prime attendees.
The class's central thread is the AI-Native ART Launch Readiness Assessment: four statements for each of the twelve success factors, each marked Fully, Partially or Not in Place, then discussed among participants to align on the size and shape of the gaps. The launch plan maps closing each gap to one of three buckets: before the first PI Outcome Planning event, before the first Sense and Respond event, or after both. There isn't much time between those first two events, so I suspect most plans will focus on what needs to happen before both.
During the "learning shop", every gap is accepted or acted upon, every action gets an owner, and, as with Core SAFe, you set a date for the first planning event. There is a lot to be said for picking a date. I think it is probably the only way ARTs actually get launched. The goal is not to be perfect; you just want to be ready enough to launch.
Core SAFe has a readiness checklist that separates the items you need, such as a Release Train Engineer, cross-functional teams and the PI Planning dates, from the desirable ones that can be addressed over the first few PIs. The AI-Native course has no equivalent, so how ready is ready enough is a call for the organisation's leaders.
That said, the AI-Native ART Launch Readiness Assessment helps organisations proceed with their eyes open. As you build out your plan, I'd be tempted to pressure-test each gap you plan to close before the first PI Outcome Planning by asking, "What is the consequence of not doing it now?" This should help you identify what can safely wait, no pun intended.
The ART Launch component of the Implementing AI-Native SAFe Roadmap
I expect, in most cases, it will take at least one PI for an ART to shift to AI-Native SAFe, and I wouldn't be at all surprised if it was closer to two. Among other things, the Implementation Roadmap expects teams to have completed AI-Native Foundations and AI-Native SAFe for Teams training before the first PI Outcome Planning. Both are two-day courses; you will probably want to spread them over two Core SAFe IP iterations to get this done.
The Table Stakes
After two days in the class and four months studying AI-Native SAFe as it was incrementally released, here is what I see as "good enough for now" (as Agilists like to say). Of the roadmap's four factors for choosing a first AI-Native ART, I see three as table stakes: clear products and outcomes, teams already embracing AI, and AI-engaged leadership.
The target for the first AI-Native ART
In AI-Native SAFe, teams commit to outcomes rather than PI objectives. That might sound like semantics, but it's not. In Core SAFe, PI objectives were more often than not an output. Historically, it was difficult for teams to commit to outcomes, as PI objectives were expected to be within the team's control and influence and deliverable within a PI. So that raises the question: what needs to be true for teams to commit to outcomes?
Can You Name the Outcomes?
AI-Native SAFe is built on the premise that outputs are no longer the constraint. When teams can build outputs at speed with AI, the hard part is building the right things, and AI-Native SAFe uses OKRs and outcome trees to aim all that output at business outcomes.
OKRs are not new to SAFe. Core SAFe recommends them for describing strategic themes, but their use and quality vary greatly. We still meet organisations that are uncomfortable with measurement, and even more uncomfortable with what Christina Wodtke calls "radical focus".
Focus means not every team gets an OKR. You don't write OKRs for business as usual, and the PI Outcome Planning article makes it clear that a team's capacity isn't entirely consumed by work related to the PI outcomes. Some organisations are going to struggle with this. I had one client a few years ago where the leaders felt it was only fair if the OKRs covered every team and "business as usual" work was included as a focus area. If your organisation is busy rewarding people for business as usual, I suspect you don't have laser focus on outcomes.
For OKRs to be meaningful, they also need to be value-based. This means the organisation needs to be clear about the products it provides, internally or externally. The AI-Native ART article states that an AI-Native ART organises around a product or group of related products, with clearly defined customers, a compelling value proposition and measurable outcomes. As mentioned earlier, I don't think this is true of every existing Core SAFe ART.
Are Your Teams Working at the Pace of AI?
The bar to get started is lower than you might think: everyone on the ART has access to AI tools and a shared grounding in how to use them. In our experience, when an ART goes through foundational AI training together, it creates a buzz around moving to an AI-enabled SDLC, and that is fertile ground for launching an AI-Native ART.
The test of readiness is higher: are the agile teams moving at the pace of AI? In the class, Rebecca Davis described an ART ready for PI Outcome Planning as one that "has enough AI in place and is moving fast enough". Teams and ARTs that are experiencing the speed, risk, frustration, freedom and empowerment of the age of AI are the perfect candidates. Put another way, they are no longer output-constrained. (Remember Andrew Sales's chart at the Summit? AI has solved the output problem, not the value problem.)
Core SAFe cautioned against writing PI objectives as OKRs, partly because key results are often lagging indicators that can't be achieved within a PI. Asking teams to commit to outcomes that fit inside a PI was typically a stretch. But if teams are working at the pace of AI, experimenting and learning faster, it is more likely an outcome can be delivered inside a PI, and OKRs at the PI level start to become a reasonable ask.
Can Your ARTs Deliver Them?
The other blocker was control. Core SAFe always intended teams to deliver outcomes, but most ARTs can't take an outcome all the way to the customer; their process stops at feature delivery and hands over to someone else. In AI-Native SAFe, several teams can contribute to the same PI outcome, so the end-to-end capability needs to exist across the ART, with each team able to own a measurable part of it. For example, if the outcome is to cut the time it takes to settle an insurance claim, the ART needs people from claims operations, not just developers. That is a long way from "I'll tell you what to do; now go and do it", which is still the mental model of leaders in many organisations.
Historically, bringing business and technology people into combined teams was challenging both politically and practically, as we tried to keep teams to 10 or fewer people. AI agents create a path to adding capability without adding people (the AI-Native Teams article already counts AI as one of four team capabilities, alongside product, builder and domain expert), which makes smaller cross-functional teams more practical and leaves the political barrier as the one to overcome. Do not underestimate that political barrier. It's been 25 years since the Agile Manifesto was published, and it is still a struggle to get business people working every day with agile teams in the enterprise context!
I saw a small version of what good looks like in the class. Tessa Powell, the course's product manager and part of the AI-Native team that built the course, refactored the companion app by vibe coding during the class and pushed live updates to us. While one course is a small product with few enterprise production constraints, it still illustrates what is possible with teams designed to deliver outcomes.
Is Your Leadership Invested?
As I was sitting in the class, I made a note to myself that perhaps the first thing an organisation needs to do to be ready for AI-Native SAFe is to establish Lean-Agile leadership behaviours. The roadmap looks for AI-engaged leaders, but more importantly, in a world where teams commit to outcomes and experimentation and failure are expected, psychological safety becomes paramount. This is not new territory for SAFe. Some of you might recall the story of the Horse's Rear Award from the original Leading SAFe classes.
Image from Leading SAFe 4.0. slides
Picture teams presenting every two weeks, including failed experiments, to executives who are used to valuing outputs. If your leaders don't have a safe-to-fail, learn and experiment mindset, I think you're in trouble. I'm reminded of some of the leaders I've worked with who like to "give points for trying" while working in ecosystems where failure is unacceptable; that mix would be confusing in this world. If we are going to live in a world of experimentation, we need a culture that accepts and rewards experimentation. If your leaders have become comfortable with the predictability Core SAFe provides, this might be an uncomfortable shift.
Fear shows up in planning too. In The ART of Avoiding a Train Wreck, we call pre-writing stories for PI Planning probably the most prevalent anti-pattern in Core SAFe, and trace one of its most common root causes to teams believing they will be penalised or criticised if they don't execute their plan perfectly.
The same goes for Business Owners. As I've talked about in previous posts, there is an expectation that Business Owners will participate in a Sense and Respond event for two hours every two weeks, and potentially more. Business Owners always complain about the time commitment Core SAFe expects, and sometimes that leads to disengagement. If your Business Owners are not prepared to be present and steer at the pace of AI, then I think you have a fundamental problem, whether you're going AI-Native SAFe or not.
What Can Evolve
I think some things can wait until after your first PI Outcome Planning, and I expect many organisations will want to iterate towards a fully AI-Native ART.
Team Operating Model
AI-Native SAFe calls a team's way of working (Scrum, Kanban, or a mix of events of its own design) its operating model, and it gives teams the freedom to choose. When the ART moves to AI-Native SAFe, its teams may not immediately change their way of working. Some teams won't have the confidence to take the training wheels off; others will be keen but won't yet have the experience to choose wisely, and will need someone to tell them when they're ready. I don't think you have to have this nailed to launch an AI-Native ART. Teams will move at different paces, and the ART-level cadences become the safety net.
Curated Data
Curated data can evolve too. (Let's face it, if you wait for all your data to be perfect, you will never launch!) Curated data is what unlocks value in the age of AI, and uncurated data is where risk lives. I spent over a decade working in the data domain, watching data be treated as the poor cousin, and for some organisations, those chickens are coming home to roost.
The framework's definition of curated data might feel a bit big and scary, but not all data has to be perfect to be fit for purpose on day one. Investment in curated data should be an economic decision, and the good news is that AI makes cleaning data cheaper! Work out which data to curate first, and plan to keep refactoring. Even in a small business like Pretty Agile, we are constantly refactoring how we structure our knowledge bases.
Practical Considerations
In the short term, while AI-Native SAFe is still evolving, the organisation will also need to solve some practical questions as it adopts AI-Native SAFe.
Prioritising PI Outcomes
Instead of prioritising features for PI Planning, Business Owners will prioritise outcomes, and AI-Native SAFe doesn't yet say how. In the class, Andrew Sales was candid that there is no method yet for ranking PI outcomes; for now, he suggested well-written key results that help anticipate the value each will deliver. Luke Hohmann described funding as a form of prioritisation. (I couldn't help but wonder if he plans to reinvent his Buy a Feature game as Buy an Outcome!) In the meantime, I suspect most ARTs will stick with what they know (i.e. WSJF), but without features to size, job size might be a challenge.
Preparing for PI Outcome Planning
In Core SAFe, it was considered an anti-pattern for teams to write stories before PI Planning, and as I said above, fear is often what drives it. In AI-Native SAFe, the expectation is that each team arrives with draft team outcomes. I see two challenges with this:
What will prevent teams from over-investing in pre-planning and becoming so attached to their plans that they are unwilling to adjust in PI Outcome Planning?
How will teams align ahead of PI Outcome Planning so that multiple teams don't arrive with the same outcome planned?
It has always been a challenge to get ARTs ready for PI Planning, and the bar for PI Outcome Planning is higher. Much of the up-front work falls on the business and product management teams, the same groups that struggle with preparation in Core SAFe.
How To Know You Are Ready
In some ways, the answer is the same as the one I would give for Core SAFe: do you have the appetite for a change of this magnitude? Relaunching is real work, and organisations that want to shift to AI-Native SAFe will need the appetite to do it.
Perhaps the best indicator that the investment is worthwhile is teams operating at the pace of AI. If Core SAFe is too slow, then maybe it is time to level up.
If you'd like to work through the readiness assessment for your own ART, we're running Launching AI-Native ARTs on 2 to 3 December and 3 to 4 February.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behaviour or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.